Contents of The Planning Guide to Piping Design
Branch Connections Instrument and Utility Air
Branch Connections Process Lines
Line Spacing Chart
Line Spanning Chart
Example Piping Class
Piping Class Identifiers
Discipline Mark-up Color Codes
Inter-discipline Drawing Review Matrix
Model Review Matrix
Linear Thermal Expansion between 70 F/210C
and Indicated Temperature
Piping Material Purchasing Matrix
Stress Analysis Inital Determination Matrix
Pipe Support Shop/Field Designation Chart
Equipment Coordinates and Elevations Matrix
List of Figures
The Planning Guide to Piping Design
Dummy Leg Standard
Base Support Standard
Shoe Standard
Single Block Vent and Drain Standard
Stick File Flowchart
Interdiscipline Drawing Review Flowchart
Interdiscipline Drawing Review Flowchart
Vendor Document Review Flowchart
Header with Line Reduction
Header with Spec . Break
(a) Control Valve without Bypass or Spec. Break
(b) Control Valve with Bypass without Spec. Break
(a) Control Valve without Bypass with Spec. Break
(b) Control Valve with Bypass and Spec . Break
(a) Single PSV without Bypass. (b) Single PSV with Bypass
(a) Single PSV without Bypass on Vessel .
(a) Multiple PSV without Bypass
@) Multiple PSV with Bypass
Inlet or Suction and Outlet or Discharge for Single Piece of Equipment
Inlet or Suction and Outlet or Discharge for Multiple Equipment in Parallel
Inlet and Outlet for Aerial Coolers
Stress Analysis Method listed in LDT
Stress Log
Stress Analysis Flowchart
Stress Isometric
Model Review Comment
Nozzle Re port
Equipment Dialogue Box
Manhour Spreadsheet Example
Manhour Graph Example
Drawing Index
Plot Plan
Piping Arrangement Key Plan
Area Piping Arrangement
Module Piping Arrangement
Isometric
Tie-In List
Heat Trace Log
PFD
P&ID
LDT
CWP Boundaries
Study Model Boundaries
Detailed Model Boundaries
(a) Single Level Module Numbering . @) Multiple
Level Module Numbering
Piping Checking Progress Spreadsheet
Demolition Drawing
Piping Design Progress Spreadsheet
Photograph of Finished Spool
Photograph of Spools Loaded for Shipment
Photograph of a Piperack Module being loaded for shipment
Photograph of a piperack Module being shipped
Photograph of an Equipment Module ready
for shipment
Spool Sheet Example
downlad link
http://bit.ly/29pxtNi2 or http://sh.st/JE31x
http://freebooks-me.blogspot.com/2016/07/the-planning-guide-to-piping-design.html
http://freebooks-me.blogspot.com/2016/07/the-planning-guide-to-piping-design.html
The Planning Guide to Piping Design
The Planning Guide to Piping Design
Contents of The Planning Guide to Piping Design
Branch Connections Instrument and Utility Air
Branch Connections Process Lines
Line Spacing Chart
Line Spanning Chart
Example Piping Class
Piping Class Identifiers
Discipline Mark-up Color Codes
Inter-discipline Drawing Review Matrix
Model Review Matrix
Linear Thermal Expansion between 70 F/210C
and Indicated Temperature
Piping Material Purchasing Matrix
Stress Analysis Inital Determination Matrix
Pipe Support Shop/Field Designation Chart
Equipment Coordinates and Elevations Matrix
List of Figures
The Planning Guide to Piping Design
Dummy Leg Standard
Base Support Standard
Shoe Standard
Single Block Vent and Drain Standard
Stick File Flowchart
Interdiscipline Drawing Review Flowchart
Interdiscipline Drawing Review Flowchart
Vendor Document Review Flowchart
Header with Line Reduction
Header with Spec . Break
(a) Control Valve without Bypass or Spec. Break
(b) Control Valve with Bypass without Spec. Break
(a) Control Valve without Bypass with Spec. Break
(b) Control Valve with Bypass and Spec . Break
(a) Single PSV without Bypass. (b) Single PSV with Bypass
(a) Single PSV without Bypass on Vessel .
(a) Multiple PSV without Bypass
@) Multiple PSV with Bypass
Inlet or Suction and Outlet or Discharge for Single Piece of Equipment
Inlet or Suction and Outlet or Discharge for Multiple Equipment in Parallel
Inlet and Outlet for Aerial Coolers
Stress Analysis Method listed in LDT
Stress Log
Stress Analysis Flowchart
Stress Isometric
Model Review Comment
Nozzle Re port
Equipment Dialogue Box
Manhour Spreadsheet Example
Manhour Graph Example
Drawing Index
Plot Plan
Piping Arrangement Key Plan
Area Piping Arrangement
Module Piping Arrangement
Isometric
Tie-In List
Heat Trace Log
PFD
P&ID
LDT
CWP Boundaries
Study Model Boundaries
Detailed Model Boundaries
(a) Single Level Module Numbering . @) Multiple
Level Module Numbering
Piping Checking Progress Spreadsheet
Demolition Drawing
Piping Design Progress Spreadsheet
Photograph of Finished Spool
Photograph of Spools Loaded for Shipment
Photograph of a Piperack Module being loaded for shipment
Photograph of a piperack Module being shipped
Photograph of an Equipment Module ready
for shipment
Spool Sheet Example
downlad link
http://bit.ly/29pxtNi2 or http://sh.st/JE31x
here
http://freebooks-me.blogspot.com/2016/07/the-planning-guide-to-piping-design.html


0 comments:
Post a Comment